Construction Production Calculator

Plan the work from a quantity. Or find the quantity that fits the time.

Scenarios and rate libraries are saved in this browser.

01 Project / closure inputs

Loading a template replaces the operation list. Duplicate your scenario first to keep a comparison.

Working calendar
Actual working weekdays
Holidays, variable shifts & night work

Optional hours by weekday override the shift length; leave blank for the default. Rates per workday always use the hours-per-workday basis above. Overnight shifts belong to their starting date. Times use the site's local civil clock; daylight-saving hour changes are not modeled.

02 Operations

Each enabled operation must finish. Sequential work shares unused shift time. “Next workday” reserves a separate day. Concurrent work needs independent crews.

03 Production assumptions & scheduling

136 work items from MDOT Roadway & Bridge Production Rates — November 2023. Rates and comments are preserved from the source, including flagged inconsistencies. These are planning assumptions, not guaranteed production. Rate edits take effect when you select “Apply library rates.”

Days/item rates are converted to items/workday; curing and lead times use calendar activities. Months use an explicit 30-day planning conversion. Additional setup, testing, or cure allowances mentioned in source notes must be added to your sequence.

Production Rate Library — edit, copy, or add rates
Ready to calculate

Scenario comparison

Duplicate Scenario saves a snapshot here and opens an editable copy. Compare alternatives using the same project unit and calendar assumptions.

Quick calculators

Focused calculations using the same quantity and production functions.